The keys to a successful result are:
Comminuted fractures must have load-bearing fixation applied across the area of comminution. The bone fragments within the area of comminution will provide no buttressing to help stabilize the fracture. A reconstruction plate with at least three and preferably four screws on each side of the comminuted area is the only mechanism by which load-bearing fixation can be provided.
Click here for a detailed discussion of load-bearing versus load-sharing fixation.
Locking versus nonlocking plates
There are several advantages to a locking plate/screw system:
Click here for a description of locking plate principles versus conventional plating.
Following special considerations may need to be taken into account:
Click on any subject for further detail.
The below aditional reading may be useful:
The intraoral approach to the angle can be selected by those surgeons experienced in the technique of plating the inferior border of the mandible using transbuccal trocar instrumentation.
However, an extraoral approach ( the submandibular approach) is often chosen because this access provides a superior view. Existing lacerations may also be used.
Open reduction and stable internal fixation in the dentate patient begins with fixation of the occlusion. Prior to placing the patient into MMF, the fracture should be exposed and any extractions determined necessary be performed. The bones should also be reduced prior to placing the patient into occlusion and securing the MMF.
Click here for further details on methods for applying MMF.
Once the fracture has been exposed, forceps can be used to manipulate the mandibular fragments into proper reduction.
Temporary/initial fixation of mandibular fragments can be accomplished by using small plates and screws applied in locations that will not interfere with the reconstruction plate.
The small plate(s) may be left in placed or may be removed after the placement of the reconstruction plate.
For load-bearing fixation, a reconstruction plate 2.4 should be used. The plate must be long enough so that there can be a minimum of three or preferably four screws on each stable fragment. Preangled reconstruction plates may be necessary to provide an adequate number of screw holes. There are advantages to using a locking reconstruction plate system.
Click here for a description of locking plate principles versus conventional plating.
The plate must be contoured to the lateral surface of the mandible, flush with the inferior and posterior borders to avoid injuring the inferior alveolar nerve.
Click here to see a step-by-step description of plate bending using locking reconstruction plate.
Insert the properly contoured plate onto the lateral surface of the mandible and hold it there using ball pointed reduction forceps. Ideally, one set of forceps would be applied anterior and one set posterior to the area of comminution.
The sequence of screw insertion is not important if the plate is securely clamped to the bone. Threaded drill guides should always be used to center the screw within the plate hole.
Click here for a step-by-step description.
Large fragments (like the triangular one in this photograph) can be secured to the plate to hold them in position.
Illustration of the completed osteosynthesis.
X-ray shows the completed osteosynthesis.
One should then release the MMF and check the occlusion for accuracy before proceeding with closure.
If arch bars or MMF screws are used intraoperatively, they are usually removed at the conclusion of surgery if proper fracture reduction and fixation have been achieved. Arch bars may be maintained postoperatively if functional therapy is required or if required as part of the fixation.
Postoperative x-rays are taken within the first days after surgery. In an uneventful course, follow-up x-rays are taken after 4–6 weeks.
The patient is examined approximately 1 week postoperatively and periodically thereafter to assess the stability of the occlusion and to check for infection of the surgical wound. During each visit, the surgeon must evaluate the patients ability to perform adequate oral hygiene and wound care, and provide additional instructions if necessary.
Adequate dental care is required in most patients having suffered a mandibular fracture.
If a malocclusion is detected, the surgeon must ascertain its etiology (with appropriate imaging technique). If the malocclusion is secondary to surgical edema or muscle splinting, training elastics may be beneficial. The lightest elastics as possible are used for guidance, because active motion of the mandible is desirable. Patients should be shown how to place and remove the elastics using a hand mirror.
If the malocclusion is secondary to a bony problem due to inadequate reduction or hardware failure or displacement, elastic training will be of no benefit. The patient must return to the operating room for revision surgery.
Follow-up appointments are at the discretion of the surgeon, and depend on the stability of the occlusion on the first visit. If a malocclusion is noted and treatable with training elastics, weekly appointments are recommended.
Postoperatively, patients will have to follow three basic instructions:
1. Diet
Depending upon the stability of the internal fixation, the diet can vary between liquid and semi-liquid to “as tolerated”, at the discretion of the surgeon. Any elastics are removed during eating.
2. Oral hygiene
Patients having only extraoral approaches are not compromised in their routine oral hygiene measures and should continue with their daily schedule.
Patients with intraoral wounds must be instructed in appropriate oral hygiene procedures. The presence of the arch-bars and any elastics makes this a more difficult procedure than normal. A soft toothbrush (dipping in warm water makes it softer) should be used to clean the surfaces of the teeth and arch-bars. Any elastics are removed for oral hygiene procedures. Chlorhexidine oral rinses should be prescribed and used at least three times each day to help sanitize the mouth. For larger debris, a 1:1 mixture of hydrogen peroxide/chlorhexidine can be used. The bubbling action of the hydrogen peroxide helps remove debris. A Waterpik® is a very useful tool to help remove debris from the wires. If a Waterpik is used, care should be taken not to direct the jet stream directly over intraoral incisions as this may lead to wound dehiscence.
3. Physiotherapy
Physiotherapy can be prescribed at the first visit and opening and excursive exercises begun as soon as possible. Goals should be set, and, typically, 40 mm of maximum interincisal jaw opening should be attained by 4 weeks postoperatively. If the patient cannot fully open his mouth, additional passive physical therapy may be required such as Therabite or tongue-blade training.